Construction Update: Land Clearing Going Well - Site Prep & Foundation Starting Soon!

Updated: Oct 15



Construction Update: Site Preparation Challenges and Progress

We’re excited to share the latest update on our construction project as we move forward with the site preparation phase. As with any construction endeavor, challenges are inevitable, but our team has been working diligently to keep things on track. Here’s a closer look at what’s been happening and what’s next.


Project Overview

  • Lot Size: 60 feet wide by 200 feet deep

  • To be Built: Two Duplex Projects

  • Current Stage: Site preparation for foundation and plumbing installation

  • Upcoming Milestones: Completion of site prep and beginning of foundation and plumbing ground install


Clearing the Land

The first major task was clearing the land, which had a forest-like number of trees. This was a substantial undertaking, especially given the density of the trees and the size of the lot. Despite the challenges, the team successfully cleared the area, revealing that the lot was two feet lower than street level.


Elevation and Leveling

With the lot cleared, we discovered that the land was significantly lower than the street level—by about two feet. To ensure proper drainage and prepare for the foundation, we need to bring in over 50 truckloads of dirt to raise the lot to street level. This is a crucial step to ensure the stability and longevity of the structure, as well as to prevent future water drainage issues.


Key Considerations:

  • Soil Quality: We’re sourcing high-quality fill dirt to ensure a stable and compactable base for the foundation.

  • Leveling Precision: Our team is using advanced equipment to precisely level the lot, ensuring it meets the required elevation and is perfectly prepared for the next stages of construction.


Weather and Delay Challenges

Unfortunately, the project has faced a few delays, primarily due to weather conditions. Heavy rain over the past couple of weeks made the site difficult to work on, especially during the tree removal process. Wet conditions not only slowed down the clearing but also delayed the installation of a perimeter fence, which was crucial for securing the site.


Impact of Delays:

  • Timeline Shift: The excessive tree removal in wet conditions set us back by over two weeks. However, we’ve adjusted our schedule and are now on track to complete the site preparation by next week.

  • Mitigation Strategies: We’ve taken measures to improve drainage and manage water on-site, which will help prevent further delays due to weather as we move forward.


Upcoming Milestones: Foundation and Plumbing Installation

With the site prep now back on track, we’re looking forward to completing this stage next week. Once the lot is leveled and ready, we’ll move on to the foundation and plumbing ground installation. This phase is critical, as it sets the groundwork for the entire structure.


Next Steps:

  • Foundation Work: After the site is leveled, we’ll begin laying the foundation, ensuring it’s solid and well-reinforced.

  • Plumbing Ground Install: Simultaneously, we’ll start the plumbing groundwork, which involves installing all necessary piping before the foundation is poured.

Conclusion

Despite the challenges we’ve faced, we’re pleased with the progress made and are confident that the project will continue to move forward smoothly. The delays were unexpected, but our team’s adaptability and commitment to quality have kept us on course. We’re excited to see the foundation take shape in the coming weeks and will continue to provide updates as we reach each new milestone.

Stay tuned for more updates as we progress through the foundation and plumbing stages. Thank you for following along with our project journey!